Working Hours 7:00am - 5:00pm

Serving the Portland Metro & Central Oregon

Generator Installation in Metzger, OR

When Metzger's Pines Come Down, Your Power Stays On

Those tall pines shading your street are beautiful — until a winter storm sends them into a power line. We install backup generators for Metzger homeowners who are done waiting on PGE to restore power after the next outage hits.

Hear from Our Customers

Whole House Generator Metzger, OR

What Changes When the Grid Goes Down and You Don't

The February 2021 ice storm was the worst PGE had seen in 40 years. Washington County took the hit hard — 82 active outages, nearly 10,000 customers without power, some for days. Then came the January 2024 wind storm. Then the November 2024 bomb cyclone that knocked out power for over 953,000 customers across the Pacific Northwest. If you live in Metzger, you already know this isn’t a once-in-a-decade problem.

What a whole house generator installation actually changes is this: the next time a storm rolls through and drops a pine tree on a line along Hall Boulevard or Greenburg Road, your home keeps running. Your heat stays on. Your refrigerator doesn’t lose everything. If someone in your home depends on medical equipment, that doesn’t skip a beat either.

You’re not scrambling for candles or booking a hotel — you’re just living your life. For a home in Metzger worth upward of $500,000, a standby generator also adds 3 to 5 percent to your property value. That’s a real number, not a sales pitch. Consumer Reports and multiple appraisal sources have tracked this consistently. You’re protecting what’s inside the house and increasing what the house is worth at the same time.

Backup Generator Installation Metzger, OR

Two Generations of Electrical Work, One Five-Year Warranty

We’ve been doing electrical work in the Portland metro since 2007. Young Electric LLC is second-generation and veteran-owned, which means our standard of work isn’t shaped by a franchise manual — it’s shaped by people who take their name seriously. Over four decades of combined experience across residential, commercial, and industrial electrical work backs every installation we do.

Metzger sits in unincorporated Washington County, which means your generator installation permits go through Washington County Building Services — not a city department. That distinction matters. We handle all permitting as a standard part of the process, including navigating Washington County’s BDAS online portal that launched in 2025. You don’t have to figure out which office to call.

We’re based in Clackamas, about 8 to 10 miles from Metzger. When you call, a real person answers. When you have a question about your job, you get a straight answer. And when the installation is done, it’s backed by a five-year warranty — well above what most local electrical contractors offer.

Install Generator for Home Metzger, OR

From First Call to First Automatic Start — Here's the Real Timeline

The first step is a site assessment. One of our licensed electricians comes to your Metzger home, looks at your electrical panel, evaluates your load, and figures out what size unit actually fits your needs. This matters more than most people realize. A lot of homes in Metzger were built in the 1970s with 100-amp panels — and a 100-amp panel often isn’t enough to support a whole-house standby generator.

If that’s your situation, we handle the panel upgrade and the generator installation together. One contractor, one process. From there, the permit gets filed with Washington County Building Services. Oregon law requires a licensed electrical contractor for generator connections, and it requires a permit — full stop.

Any installer who skips that step is cutting a corner that could void your warranty and create real liability down the road. We pull the permit, schedule the inspection, and make sure everything meets the Oregon Electrical Specialty Code. The physical installation — setting the pad, running the gas line connection, wiring the automatic transfer switch, and connecting the unit — typically takes about a day once permits are in place.

But the full process from first call to final inspection usually takes several weeks, depending on permit timelines and scheduling. If storm season is on your mind, the time to start is now, not after the next wind event.

Emergency Generator Installation Metzger, OR

Everything Included, Nothing Left to Figure Out on Your Own

Generator installation in Metzger isn’t a single task — it’s a coordinated process that touches electrical, gas, permitting, and code compliance. We handle all of it. That includes helping you select the right generator type and size for your home’s actual load, not a one-size-fits-all recommendation.

Portable units require you to go outside in a storm, store fuel, and hook things up manually. Standby generators — the kind we install — detect an outage and start automatically within seconds, running on natural gas or propane without any action from you. Because Metzger is in unincorporated Washington County, the permitting process runs through Washington County Building Services rather than a city department.

We know that process and handle it directly. The installation includes an automatic transfer switch, which Oregon code requires for any generator connection — it prevents unsafe back-feeding into the grid and is not optional. That switch is what makes everything automatic. Every installation is backed by a five-year warranty on the work itself.

We cover all generator sizes and types — from smaller backup units for essential circuits to full whole-house standby systems. If your home needs a panel upgrade before a generator can be properly installed, that’s part of what we do as a full-service electrical contractor. One call covers the whole scope.

Do I need a permit to install a backup generator in Metzger, OR?

Yes — and this is one of the most important things to understand before you hire anyone. Oregon law requires a licensed electrical contractor to make generator connections, and that work requires a permit. There are no exceptions for unincorporated areas like Metzger.

Because Metzger is in unincorporated Washington County rather than an incorporated city like Tigard or Beaverton, your permit comes from Washington County Building Services — not a city building department. Washington County launched a new online permitting portal in early 2025, so the process has changed recently. We file the permit, coordinate with the county, and schedule the required inspection as a standard part of every installation.

If a contractor tells you a permit isn’t necessary or offers to skip it to save time, that’s a serious red flag. Skipping the permit can void your equipment warranty, create liability if something goes wrong, and cause problems when you sell your home.

The right size depends on what you want to run during an outage and how your home’s electrical system is set up. A proper installer starts with a load calculation — figuring out the actual electrical demand of your home — rather than guessing or defaulting to the biggest unit available.

For most Metzger homes, the relevant factors include square footage, whether you have electric heat or gas heat, whether you have a well pump, and whether there are any medical devices or home office equipment that need to stay running. A smaller unit might handle essential circuits like heat, refrigeration, and lights. A larger standby system can run the whole house without you noticing the grid is down at all.

What matters is matching the generator to your actual load — not oversizing to justify a higher price or undersizing to hit a lower number. We walk you through this during the site assessment so you’re making a decision based on real information.

It can, and it’s worth asking about before you get too far into the process. Homes built in the 1960s and 1970s — which make up a significant share of Metzger’s housing stock — were typically built with 100-amp electrical service panels. That was the standard at the time and it worked fine for the appliances of that era.

The issue is that a whole-house standby generator paired with an automatic transfer switch often requires 200-amp service to operate properly alongside a modern home’s electrical load. If your panel is still at 100 amps, it may need to be upgraded before the generator installation can be completed correctly. This isn’t a dealbreaker — it just means there’s an additional step.

We handle panel upgrades as part of our full-service electrical work, so if your Metzger home needs both, you’re dealing with one contractor and one process rather than coordinating between two separate companies. The site assessment is where this gets identified and factored into the plan.

The physical installation — setting the generator pad, running the gas line connection, wiring the transfer switch, and connecting the unit — typically takes about a day once everything is in place. But the full process from your first call to the final inspection is usually several weeks.

Here’s what fills that time: the site assessment, the permit application filed with Washington County Building Services, the county’s plan review and permit issuance, any gas line coordination if needed, and the scheduling of the final inspection. These steps can’t be skipped or rushed. The permit review timeline in Washington County varies, and scheduling can get backed up during high-demand periods — which in the Pacific Northwest means fall and early winter, right when everyone else who waited too long is also calling.

If you’re thinking about getting a generator installed before storm season hits Metzger, the practical answer is to start the conversation now. Waiting until after the first major wind event means waiting in line behind a lot of other people who had the same idea.

A portable generator requires you to go outside, set it up, connect it manually, and keep fuel on hand. During a Metzger winter storm — when it’s dark, wet, and potentially icy — that’s a real problem. Portable units also can’t power your whole house, and they carry a serious carbon monoxide risk if used improperly or too close to the home.

A standby generator is permanently installed outside your home, connected to your natural gas or propane line, and wired into your electrical panel through an automatic transfer switch. When PGE cuts out — whether it’s 2 in the afternoon or 2 in the morning — the generator detects the outage and starts automatically within seconds. You don’t have to do anything.

Your heat, refrigerator, lights, and any medical equipment keep running without interruption. For a home in an area like Metzger, where the mature tree canopy makes wind and ice storm outages a recurring reality, that automatic response is the whole point. You’re not managing a crisis — you’re just continuing your day.

Yes, and the numbers are specific enough to be worth knowing. A standby generator typically adds 3 to 5 percent to a home’s resale value, according to Consumer Reports and multiple appraisal sources that have tracked this over time. For a Metzger home with a median property value around $513,000 to $541,000, that works out to roughly $15,000 to $27,000 in added value.

That matters for a couple of reasons. First, it means the generator can effectively pay for itself in resale value before you factor in a single hour of protection. Second, buyers in the Portland metro — particularly in areas like Metzger that have experienced repeated storm outages — increasingly see backup power as a practical feature, not a luxury add-on.

Washington County homeowners who lived through the 2021 ice storm or the 2024 wind events know what extended outages actually cost in food loss, hotel stays, and disruption. A home that already has a standby generator installed and inspected is a more attractive property than one that doesn’t. That’s a straightforward value proposition for anyone thinking about long-term investment in their Metzger home.